Workplace charging, multi-unit residential, fleet depots and retail across the Triangle. Load assessment, utility coordination and installation.
Licensed NC contractor · Permit handled · Flat quote

A home install is one circuit. A commercial site is a load study, a conversation with the utility, a decision about whether to run single or three phase, and usually a plan for adding more units later without redoing the infrastructure.
The mistake we see most: installing four chargers today with no provision for twelve. The conduit and panel capacity to expand later costs very little now and a great deal in three years.
Most sites do not need a bigger service. They need chargers that talk to each other and share the available capacity — eight units on a circuit sized for three, because they are never all charging at full rate simultaneously. That is usually the difference between a manageable project and a six-figure one.
Answer four questions and you get a real number, not a callback promise. Most quotes come back in under five minutes — including evenings and weekends.
No obligation · We pull the permit · Licensed NC contractor