What an EV charger actually costs to install in Apex — including what changes the number, and when a panel upgrade is genuinely needed.
25 minutes from our Garner base · Permit handled · Licensed NC contractor

Home › Apex
Apex has grown almost entirely since 2000, so nearly every home we see has a 200A panel with room for a 60A circuit. Panel upgrades are rare here. Installs are usually same-day.
Apex runs its own municipal electric utility rather than being served by Duke Energy. That matters for EV owners — service upgrades and any load questions go through Apex Electric Utilities directly, and the process is generally quicker than working with a large regional utility.
Worth knowing locally. Because Apex owns its grid, rebate and time-of-use programmes here are set by the town, not by Duke. VERIFY current Apex Electric programmes before quoting savings.
Electrical permits for Apex are issued by Town of Apex Building Inspections, and power is supplied by Apex Electric Utilities (town-owned). We pull the permit in our name, book the inspection and meet the inspector on site. You do not need to file anything or take a day off work for it.
We install regularly across Scotts Mill, Haddon Hall, Bella Casa, Sweetwater and Riley's Pond, along with the rest of Apex — around 75,000 people and growing.
The charger itself is separate — around $420 for a Tesla Wall Connector, from $350 for a universal unit. Installing one you already own costs the same.
Cary · Durham · Chapel Hill · Morrisville · Wake Forest
More for Apex: EV charger installation in Apex · EV charger electricians in Apex
Answer four questions and you get a real number, not a callback promise. Most quotes come back in under five minutes — including evenings and weekends.